Remove Ceiling Systems Remove Stonework Remove Wall Systems
article thumbnail

Explore the Building Products That Make This Year's New American Home Another Standout

The Pro Builder

Signature Kitchen Suite Wall Oven The Double Wall Oven With Steam-Combi from Signature Kitchen Suite * provides everything for sous vide cooking. All models include the TouchSmart Wall Control and Safe Touch Glass. The washer’s built-in sensors automatically select wash motions and temperature settings for each load.

article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

It includes an owner’s bedroom on the opposite end of the rear elevation that fully embraces the valley, and walls of glass at the home’s entry and along the back of the house that showcase a through-view to the lights of Las Vegas and the mountain range beyond. Project specs: The New American Home 2024 Location: Ascaya , Henderson, Nev.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Protecting lives and our most important heritage

Specification Product Update

The goal was to ensure the window’s ornate stonework and glass would be effectively protected in the event of a fire, balancing aesthetics with the need to ensure safety for town hall users, as well as to protect the culturally important building itself.

article thumbnail

15 Difference Between Plastering And Pointing | What Is Plastering | What Is Pointing

CivilJungle

Plastering is the practice of coating rough walls including irregular surfaces in the building or houses as well as other buildings with plastic material termed plaster. Cement mortar of 1: 4 either 1: 6 is quite widely included in plastering, the richer mixture being used for outside walls. What Is Plastering? To give a good glance.

article thumbnail

Green Home Building and Sustainable Architecture: An Alternative.

Natural Building

First we inspected the yoga studio, a lovely, invitingly open space with floating bamboo floors and vaulted ceiling. There is a mechanical room that houses all of the equipment associated with her photovoltaic electrical system and the active solar water and space heating system, which serve both the home and the studio.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.