Remove Closeout Remove Fire Protection Systems Remove Foundation Systems
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 00 65 00 Closeout Forms.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 00 65 00 Closeout Forms.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

40 Under 40: Champions of Construction 2022

Autodesk Construction Cloud

Digitizing 500+ Amazon facilities from the local archived library to an interactive virtual infrastructure world, Fei and his team are building the foundation for the company’s digital twin ecosystem. She was part of the team that executed the 950 Market job in San Francisco, and she was there from excavation to closeout.

article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

During this time Giana also supported Engineers Without Borders USA where she oversaw a team of 25 to develop a water storage system for a village in northwestern Thailand. With her diverse background of skills, Isabel is able to approach the needs of transportation authorities from an integrated system level perspective.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Leg islative Intent: Taxpaye r investment in Federal facilities must be protected and leveraged through the cost savings involved in maximizing building performance. Reviewers admired the system’s three levels of increasing knowledge, skills and abilities as a “concept”, but did not believe it was implementable government-­?wide.