Remove Closeout Remove Handover Remove Inspection
article thumbnail

How to easily create a construction closeout report using Fieldwire

Field Wire

What is a construction closeout report? A closeout report is a document created at the end of a construction project to summarize important trends of said project. It may include final inspections and punch lists , changes to scope, budget and timeline, and even milestones or lessons learned.

article thumbnail

The 3 Core Pillars for Redefining Construction Handover 

Autodesk Construction Cloud

Handover is often thought of as happening only at the end of a project. But project handover really spans the lifecycle of a project as it involves multiple stakeholders, processes, and activities within that lifecycle. For that reason, it’s critical to get handover right from the very beginning.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

7 Steps to Successful Project Closeout

Autodesk Construction Cloud

Often the last thought in your mind when your job is running full speed ahead is project closeout. A successful closeout is key to your financial success because it allows you to receive final payments. It’s all about the closeout process. A successful closeout is important for receiving final payouts. Key Takeaways.

article thumbnail

TCG Construction: Simplified Snag Lists and Faster Project Closeouts with Fieldwire

Field Wire

TCG Construction were pioneers in using Fieldwire in the fitting out industry, and have seen great results, especially in project closeout. With Fieldwire, it took me roughly a week to conduct the inspection, and then 20 to 30 minutes to generate the report. Their clients have also been happy with the faster closeouts, said Harvey.

article thumbnail

The Complete Guide to Project Commissioning

Autodesk Construction Cloud

Owners and clients expect a seamless handover, which is the key to efficient facility management and operations. For contractors, a clean handover process is also a way to win more work and retain loyal clients. But while closeout is essential, planning for a seamless handover happens well before ground is broken.

article thumbnail

How Much is Poor Construction Document Management Costing You? 

Autodesk Construction Cloud

Unfinished Closeout Packages Closeout packages should include the latest versions of all drawings and files related to the layout, construction, and internal systems of a structure. Unfortunately, handover packages often contain only a portion of the data they should, or they rely on outdated and incorrect documents.

article thumbnail

12 Essential Construction Process Management Steps that Project Managers Should Follow

Jonas Construction

While site inspections provide valuable information, it’s important to consider the details that may be missed, overlooked, or too time-consuming to collect, such as the percentage of work completed. Project Closure (Steps 10-12) “I just love doing project closeout,” said nobody, anytime in the history of mankind.