Remove Collaboration Remove Definition Remove Integrated Project Delivery (IPD) Remove Quality Assurance
article thumbnail

BIM – Job Order Contracting – Integrated Project Delivery

Building Information Management

Integrated design increasingly is recognized as a potential method to assure all performance criteria are considered and optimized in the design and construction of buildings. As indicated above, the participating disciplines must trust the validity of the information provided by other collaborators. – NIBS.

article thumbnail

Performance-based Procurement & Project Delivery for Facilities Repair, Renovation, and More!

Job Order Contracting

Efficient management of the numerous repair, renovation, and construction project facing real property owners requires changing how owner, architecture, engineer, and builder relationships are structured. That said, not all implementations or tools for IPD and JOC are the same. appeared first on 4BT.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Rethink, Reshape, Rewrite Your Facilities Repair, Renovation, and Construction Procurement and Project Delivery Methods

Job Order Contracting

Rethink, Reshape, Rewrite Your Facilities Repair, Renovation, and Construction Procurement and Project Delivery Methods. The only proven way to improve facilities management outcomes is to RETHINK,, RESHAPE, and REWRITE your facilities repair, renovation, and construction procurement and delivery methods. The Solution.

article thumbnail

LEAN Pre-Construction Services Considerations

Job Order Contracting

Pre-Construction Services include the following… Project Conceptualization. Project Delivery Method Selection. Adopting a LEAN pre-construction services approach REQUIRES collaboration among all participants and stakeholders and front loads their participation and information-sharing. Collaborative teams.

article thumbnail

TFM Article – BIM, Cloud Computing, IPD and JOC

Building Information Management

As they pass the emergent stage, BIM and cloud computing will continue to impact project delivery. Emergent disruptive technologies and construction delivery methods are altering both the culture and day-to-day practices of the construction, renovation, repair, and sustainability of the built environment.

article thumbnail

Job Order Contracting Life-cycle Facilities Value Management

Job Order Contracting

INTRODUCTION – The goal of Job Order Contracting Life-cycle Facilities Value Management activities is to maximize the value of physical structures and assure appropriate ownership of the project outcomes over the project’s life span. Both collaborative construction delivery methods, JOC and IPD, focus upon best value.

article thumbnail

Performance-based Construction Contracting

Job Order Contracting

Performance Based Contract Management principles for Construction have existed for decades, and include Integrated Project Delivery and Job Order Contacting. Quality Assurance and Quality Control. Supporting collaborative technology. Implementation includes: Written Operation/Execution Manuals.