Remove Collaboration Remove Flooring Systems Remove Wall Systems
article thumbnail

A Case (Study) for Off-Site Construction in Home Building

The Pro Builder

Rather, it employed an off-site construction method that built all of the wall panels, floor panels, and roof trusses in a nearby factory and assembled them on site in fewer than three days. Agorus' framing package for Daybreak included premade floor systems, each panel specifically engineered for its application in the system.

article thumbnail

Tangram Interiors Is Now a Certified Woman-Owned Business, Led by Chairman Sonya Mitrovich Lozowski, MD

Civil + Structural Engineer

Mitrovich Lozowski brings years of experience to the table, having served as a Managing Member of Pacific Holdings and a Medical Director of a health center at the University of MI Health System. The company has nurtured a collaborative and people-focused culture in the belief that people fuel innovation.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

D.R. Horton Buys 250,000 Grass-Made, Structural Panels from Plantd

The Pro Builder

Horton , is collaborating with innovative startup Plantd to install 250,000 alternative structural panels in over 1,000 homes. The company’s collaboration with D.R. Horton’s purchase of 250,000 Plantd panels will be used for wall sheathing and roof decking. The startup’s collaboration with D.R.

article thumbnail

Robust Facilities Sustainment Solution

Job Order Contracting

Build and support collaborative internal and external planning, procurement, and project delivery terms. #5. to name a few. #2. to name a few. #2. to name a few. #2. Implement a robust physical asset facilities maintenance process integrating scheduled, unscheduled repairs, and preventive maintenance tasks. #3.

article thumbnail

DFI Announces 2023 Outstanding Project Award Winner

Civil + Structural Engineer

This project ranks among the largest Thornton Tomasetti has designed for a tied back soldier pile and lagging system and is the most complex with regards to numbers and complexity of tieback installation. “We Its 65 ft (20 m) deep perimeter foundation wall system presented many challenges. vice president, Thornton Tomasetti.

article thumbnail

Lawrence Group Takes Care to Maintain Original Architect’s Vision While Renovating Library at Iowa’s Simpson College

Civil + Structural Engineer

Time had taken its toll on the iconic building, which had a leaking roof and obsolete building systems which contributed to a drag on the university’s operating budget. Central to the preservation effort was also replication of the library’s curtain wall module and cedar brise soliel (sun shade) on its south façade.

article thumbnail

Homes That Are Both Prefab and Predesigned

The Pro Builder

Their collaboration enables homeowners or builders to select from Hereabout’s list of preexisting, ready-to-use design plans, then build the home using B.PUBLIC’s prefab floor, roof, and wall panels. Its prefab panels don’t contain electrical or plumbing systems. B.PUBLIC doesn’t create modular units.