Remove Concrete Pouring Remove Contracts Remove Magazine Remove Ramps
article thumbnail

Innovating LXRP’s

Roads Online

The integrated counterforts are jointed onsite to a structural concrete footing, which then forms a highly efficient and robust cantilever retaining wall. It involves construction of a 180 metre-long bridge that connect into two approach ramps, with three lanes city-bound and two outbound lanes. To read the magazine, click here.