Remove Concrete Pouring Remove Electrical Systems Remove Flooring Systems Remove Plumbing Systems
article thumbnail

Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.

article thumbnail

All About Floating Houses | What Are Floating Houses | Type of Floating Houses | What Is Floating Building | Floating Architecture Examples

CivilJungle

Floating houses are permanently connected with electrical wirings, plumbing lines, sewer lines, etc. The weight of concrete is too heavy that’s why to reduce the weight of the whole structure engineers includes wooden particle or plywood particle for constructing the whole structure. What Is Floating Building? Related Article.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

Slabs are structural elements manufactured from concrete constructed to produce flat surfaces, usually horizontal, in building floors, roofs, bridges. If reinforcement is required, slabs could also be pre-stressed or the concrete will be spilled over rebar positioned within the framework. What Is a Slab? Types of Slabs.

article thumbnail

Water Leakage from Ceiling | water leakage from ceiling | How to Stop Water Leakage from Ceiling

CivilJungle

Water can be the most destructive element for structures that are mainly constructed from concrete. The water leakage problems are due to various issues such as defective plumbing systems. If the lack of drainage system provided due to which the water is getting accumulated and causes the problems of leakages.

article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

Generally, the plinth is built slightly well above the ground floor sometime after the foundation. It lifts the ground just above floor level and stops seawater from entering the house. DPC stops groundwater for increasing to the floors. Also, Read: What Is Flooring | Types of Flooring. Substructure. Plinth Beam.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Pour Grade is a two component Polysulphide sealant.

article thumbnail

How to Get Rid of Rotten Egg Smell in House

CivilJungle

Also, read: Concreting in Construction | Classification | Properties | Grades | Advantage & Disadvantage | Quality Control. How to Remove Egg Smell from Floor? It is believed that Natural ways are the best to remove egg smell from the floor. Egg smell on the floor can be easily removed if we are using lemon.