Remove Concrete Pouring Remove Electrical Systems Remove HVAC System Installation
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete).

article thumbnail

Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

The construction process and various finishing activities, such as pouring concrete, or dry wall finishing, can generate large amounts of moisture. Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating. A 102-mm (4-in.)-thick

article thumbnail

Demystifying carbon offsets vs direct reductions

BDC Network

Some credits score high in quality for being permanent and delivering positive environmental and social impacts, for instance, the installation of solar panels for low-income, elderly communities on fixed incomes. The CCQI assessment methodology then identifies and weights which of these factors are most significant for carbon credit quality.

article thumbnail

Overcoming Challenges in Basement Lowering with Bench Footing

CCR Magazine

Some homes have narrow or low-access points, making it difficult to bring in the necessary equipment for excavation and concrete pouring. Disruptions to Existing Utilities When lowering a basement floor, there is a need to adjust plumbing, electrical, and HVAC systems.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Pour Grade is a two component Polysulphide sealant.

article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

Also, Read: What Is Tie Beam | Tie Beam Details | Advantages of Using Tie Beam | Tie Beam Reinforcement | Why Are Use Concrete Tie Beam. This may be constructed of various materials, such as bricks, gravel, mud, concrete blocks, lateral blocks, respectively. This system uses a continuous cleat for high wind uplift resistance.