Remove Concrete Pouring Remove Electrical Systems Remove HVAC Systems
article thumbnail

Retail Construction: 3 Construction Cost-Savings Tips for De-malling a Shopping Mall

HardHatChat

Reusable elements should include: Steel and concrete – save as much of the physical shell as you can. The base structure – no need to pour a new foundation. Roof systems – depending on their age and how they work into the new plan. Concrete slabs – only cut as needed to accommodate tenants.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete).

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

The construction process and various finishing activities, such as pouring concrete, or dry wall finishing, can generate large amounts of moisture. Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating. A 102-mm (4-in.)-thick

article thumbnail

Demystifying carbon offsets vs direct reductions

BDC Network

And replacing older inefficient fossil-fuel heating equipment with electric heat pump systems may lower energy costs and will improve employee comfort through effective heating and cooling. Any cost increase for more efficient energy systems should be evaluated through the lens of economic savings, ease of maintenance, and durability.

article thumbnail

Overcoming Challenges in Basement Lowering with Bench Footing

CCR Magazine

Some homes have narrow or low-access points, making it difficult to bring in the necessary equipment for excavation and concrete pouring. Disruptions to Existing Utilities When lowering a basement floor, there is a need to adjust plumbing, electrical, and HVAC systems.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Pour Grade is a two component Polysulphide sealant.