Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.

article thumbnail

Why Is a Moisture Barrier Needed for Concrete Flooring?

Construction Daily News

Interior concrete flooring always needs a solid barrier underneath it to prevent moisture from seeping up from the ground. A concrete flooring moisture barrier prevents cracking, curling, efflorescence and air quality problems, and it may even be a requirement in building codes and warranties.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

Generally, the plinth is built slightly well above the ground floor sometime after the foundation. It lifts the ground just above floor level and stops seawater from entering the house. DPC stops groundwater for increasing to the floors. Also, Read: What Is Flooring | Types of Flooring. Substructure. Plinth Beam.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Pour Grade is a two component Polysulphide sealant.

article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Floor Slab or Roof Structure. Electrical and Plumbing. To inaugurate a coding system. Arrange Construction Site & Pour Foundation. Perform Rough Plumbing , Electrical HVAC. Install Insulation. Finish Interior Trim, Install Exterior Walkways & Driveway. Excavation. Foundation.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete).

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Clean scale from head(s) after removing and install cover plate. Remove fill tube cap, install spacer pipe and install fill tube. Remove fountain head cover(s) (if applicable) and install fountain head. Application: This standard applies to all installed sprinkler systems with nozzles. Check Points: Fall 1.