Remove Concrete Pouring Remove Flooring Systems Remove HVAC System Installation Remove Roofing Systems
article thumbnail

Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

By Chadwick Collins Photo and illustrations courtesy Single Ply Roofing Industry (SPRI) An often-overlooked issue during new construction or a commercial renovation project is the addition of unwanted moisture into the structure. Typically, water vapor or moisture movement—called diffusion—travels from warm humid (i.e.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

Generally, the plinth is built slightly well above the ground floor sometime after the foundation. It lifts the ground just above floor level and stops seawater from entering the house. DPC stops groundwater for increasing to the floors. Also, Read: What Is Flooring | Types of Flooring. Substructure. Plinth Beam.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Pour Grade is a two component Polysulphide sealant.

article thumbnail

Best Pool House Designs | Do I Need a Permit for a Pool House | What Is the Average Size of a Pool House

CivilJungle

When in-floor pools forget the guideline of attaching resale value, a pool home will be the correct item. Piping allows will be necessary for HVAC and a cooker. HVAC allows if you design a middle air method and a fire allow will be necessary if you have a rest room. On-floor paved cement pool and sealed free zone.

Permits 52
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete). After the foundation work is completed, ground beam formwork preparation has been started and poured with concrete. Floor Slab or Roof Structure. Internal walls are plaster with a smooth finish, and flooring is done with tiles.

article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Floor Slab or Roof Structure. To inaugurate a coding system. Arrange Construction Site & Pour Foundation. Perform Rough Plumbing , Electrical HVAC. Install Insulation. Finish Interior Trim, Install Exterior Walkways & Driveway. formula aid to fix concrete goals. Site Clearance.