Remove Concrete Pouring Remove Flooring Systems Remove HVAC Systems
article thumbnail

Retail Construction: 3 Construction Cost-Savings Tips for De-malling a Shopping Mall

HardHatChat

Don’t work against the existing shopping center floor plans, but evolve them into the new design. Reusable elements should include: Steel and concrete – save as much of the physical shell as you can. The base structure – no need to pour a new foundation. Roof systems – depending on their age and how they work into the new plan.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete). After the foundation work is completed, ground beam formwork preparation has been started and poured with concrete. Floor Slab or Roof Structure. Internal walls are plaster with a smooth finish, and flooring is done with tiles.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Is a Moisture Barrier Needed for Concrete Flooring?

Construction Daily News

Interior concrete flooring always needs a solid barrier underneath it to prevent moisture from seeping up from the ground. A concrete flooring moisture barrier prevents cracking, curling, efflorescence and air quality problems, and it may even be a requirement in building codes and warranties.

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

The construction process and various finishing activities, such as pouring concrete, or dry wall finishing, can generate large amounts of moisture. Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating. A 102-mm (4-in.)-thick

article thumbnail

Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.

article thumbnail

Appetite For Growth: New Store Construction and Renovation Tips For Expanding Grocery Brands

Commercial Construction Blog

For example, depending on a site’s soil makeup, timber piles may need to be driven into the ground or concrete caissons poured to support a building’s foundation. Likewise, although expensive infrastructure like refrigeration and HVAC are in place, they could possibly be at the end of their life expectancy or require maintenance.

article thumbnail

Overcoming Challenges in Basement Lowering with Bench Footing

CCR Magazine

This technique is particularly useful for homeowners looking to lower their basement floors while maintaining the integrity of their existing foundation. This ledge supports the new foundation layer while the floor is lowered. Moving these utilities can be complicated, especially if the home has older systems that may need updating.