Remove Concrete Pouring Remove Flooring Systems Remove Millwork
article thumbnail

Schimenti Announces Printemps Opening at One Wall Street

CCR Magazine

” Spanning 55,000 square feet over two floors, the U.S. Schimenti’s scope extended beyond typical construction, managing every interior detail, including custom lighting, audiovisual systems, furniture, artwork, and high-end finishes. Equal parts gallery and retail, the space includes areas to shop, relax, and linger.

article thumbnail

The Bronx Vibe, a New, 155-residence, Luxury Rental Development

CCR Magazine

The second floor features a 6,700-square foot yard in the back of the building, which is one of several outdoor tenant amenities. The 11th and 12th floors house multiple amenities, most of which are designed to take advantage of the breathtaking Manhattan views that are available from these floors.

article thumbnail

3 Secrets to Serving Up Restaurant Construction Success from a Top Restaurant Contractor

Commercial Construction Blog

Plus, these mechanicals often are installed underground, before concrete goes in and walls are laid out – so the construction team is essentially laying the grid for the entire mechanical system without any landmarks to guide them. Amped-Up Restaurant Construction Inspections.