Remove Concrete Pouring Remove HVAC System Installation Remove HVAC Systems
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete). After the foundation work is completed, ground beam formwork preparation has been started and poured with concrete. They’re installed in the walls and slabs such that they are concealed and not visible after the finishing work is done.

article thumbnail

Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Is a Moisture Barrier Needed for Concrete Flooring?

Construction Daily News

Interior concrete flooring always needs a solid barrier underneath it to prevent moisture from seeping up from the ground. A concrete flooring moisture barrier prevents cracking, curling, efflorescence and air quality problems, and it may even be a requirement in building codes and warranties. It can also lead to floor discoloration.

article thumbnail

Key Elements in a Fluid-applied Barrier System Specification

Construction Specifier

By Karine Galla Air and water-resistive barrier systems play a crucial role in the longevity and performance of commercial buildings, and safeguarding against issues such as excessive energy consumption and moisture-related damage. In this scenario, impermeable air barriers will most effectively block moisture from entering the wall system.

article thumbnail

Demystifying carbon offsets vs direct reductions

BDC Network

Some credits score high in quality for being permanent and delivering positive environmental and social impacts, for instance, the installation of solar panels for low-income, elderly communities on fixed incomes. The CCQI assessment methodology then identifies and weights which of these factors are most significant for carbon credit quality.

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

The construction process and various finishing activities, such as pouring concrete, or dry wall finishing, can generate large amounts of moisture. Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating. A 102-mm (4-in.)-thick

article thumbnail

Overcoming Challenges in Basement Lowering with Bench Footing

CCR Magazine

Some homes have narrow or low-access points, making it difficult to bring in the necessary equipment for excavation and concrete pouring. Disruptions to Existing Utilities When lowering a basement floor, there is a need to adjust plumbing, electrical, and HVAC systems.