Remove Concrete Pouring Remove HVAC System Installation Remove Piping Installation Remove Plumbing Systems
article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

Also, Read: What Is Tie Beam | Tie Beam Details | Advantages of Using Tie Beam | Tie Beam Reinforcement | Why Are Use Concrete Tie Beam. This may be constructed of various materials, such as bricks, gravel, mud, concrete blocks, lateral blocks, respectively. This system uses a continuous cleat for high wind uplift resistance.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Pour Grade is a two component Polysulphide sealant.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete).

article thumbnail

BIM Clash Detection: A Quick Guide 

Autodesk Construction Cloud

These conflicts, or “clashes,” arise when different design components, such as structural elements, HVAC systems, or electrical conduits, intersect or interfere with the buffer zone of another object. Similarly, safety issues like a high-voltage wire being too close to a plumbing line could constitute a soft clash.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. Clean scale from head(s) after removing and install cover plate. Check and clean fill tube, remove spacer pipe and cap fill tube. Remove fill tube cap, install spacer pipe and install fill tube. Clean motor and assembly.