Remove Concrete Pouring Remove HVAC System Installation Remove Piping Installation Remove Waterproofing Systems
article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Adhesive resins such as bitumen, tar, natural gum, wax etc.

article thumbnail

16 Types of Building Components | How a Building Is Constructed | 19 Different Types of Building Construction Phases

CivilJungle

The damp proof course is often a coating of waterproofing substance including such asphalt and waterproof cement. Also, Read: What Is Tie Beam | Tie Beam Details | Advantages of Using Tie Beam | Tie Beam Reinforcement | Why Are Use Concrete Tie Beam. This system uses a continuous cleat for high wind uplift resistance.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Pool House Designs | Do I Need a Permit for a Pool House | What Is the Average Size of a Pool House

CivilJungle

If you desire a change, washroom, or cook room, piping allows will be necessary. Piping allows will be necessary for HVAC and a cooker. You can block this into the piping, but you will want a different figure. HVAC allows if you design a middle air method and a fire allow will be necessary if you have a rest room.

Permits 52
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete). After the foundation work is completed, ground beam formwork preparation has been started and poured with concrete. They’re installed in the walls and slabs such that they are concealed and not visible after the finishing work is done.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. Clean scale from head(s) after removing and install cover plate. Check and clean fill tube, remove spacer pipe and cap fill tube. Remove fill tube cap, install spacer pipe and install fill tube. Clean motor and assembly.