Remove Contracts Remove Fire Protection System Installation Remove Structural Systems
article thumbnail

Rhino Doors nears completion on London Underground’s Bank Station project

Civil + Structural Engineer

Rhino Doors, the UK’s leading manufacturer of high-performance engineered doors, has nearly completed work on a complex £1 million-plus contract on the London Underground network. We have had to be responsive to the demands of this installation – it has been very much a bespoke solution,” said Dr Norris.

article thumbnail

Exploring Durable Materials for Your Next Building Project

UK Construction Blog

The right selections enhance structural integrity while adding value to the property. Understanding durable options helps you create structures that withstand time and environmental challenges. Thermally modified timber undergoes heat treatment that alters its cellular structure, increasing stability without chemicals.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. These defects range from minor aesthetic issues like cracked tiles to serious structural problems that compromise safety.

article thumbnail

McConnell Dowell completes works on Port Kembla Energy Terminal

Roads Online

McConnell Dowell’s scope of work included the construction of a new wharf, revetment, quay wall, nine dolphins, wharf furniture, main equipment foundations, and marine loading arm platform structures. The front wall was anchored to a further sheet-piled continuous wall using 161 tie-rods each 35 m long and approximately 150 mm diameter.

article thumbnail

How to Choose Trusted Tiny Home Builders in Queensland: Expert Guide 2025

UK Construction Blog

Their expertise covers unique building techniques, system planning, and tiny house requirements. Some even extend coverage to 15 years for structural elements. The most trustworthy builders carry proper insurance and provide clear contracts that spell out warranty terms, project timelines, and backup plans. Maximum height: 4.3m

article thumbnail

Refine versus shine: Defining and defending design intent with refined concrete

Construction Specifier

LEED AP, Vivian Volz, CSI, AIA, LEED AP, SCIP Photo courtesy Tao Group Solutions After years of grappling with client callbacks, legal disputes, and financial losses from poor polished concrete installations, the industry has reached a breaking point: prohibit polished concrete. In that case, they may actually be looking for refined concrete.

article thumbnail

Curtain wall design-assist: Navigating the process for success

Construction Specifier

Curtain wall systems are ever present in today’s commercial construction marketplace. Design-assist is a popular procurement method for curtain wall systems in today’s commercial market, intended to help resolve these challenges, particularly for custom curtain walls with unique performance requirements and/or unique material configurations.