article thumbnail

Rhino Doors nears completion on London Underground’s Bank Station project

Civil + Structural Engineer

Rhino Doors, the UK’s leading manufacturer of high-performance engineered doors, has nearly completed work on a complex £1 million-plus contract on the London Underground network. We have had to be responsive to the demands of this installation – it has been very much a bespoke solution,” said Dr Norris.

article thumbnail

REMEDI8 Highlights Mobile Containment Unit for Dust Control

Civil + Structural Engineer

DUST-10C mitigates dust in debris-heavy environments like construction LENEXA, KS – REMEDI8®, the national leader of fire protection and fire protection and compliance solutions, highlights its DUST-10C for dust containment in a variety of settings. The unit also comes with a pass-through power cord opening.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FIREFLY® SYSTEMS UPGRADE ROOFSPACE OF NORTHAMPTONSHIRE CARE FACILITY

Specification Product Update

The companys Contract Manager, Daniel Oldacre, commented: A key aspect of the specification of the products for this job was the fact that FIREFLY is the only manufacturer which has a fully tested hatch as part of their barrier. The work was carried out over a three-week period in April 2024.

article thumbnail

No Pressure: How Will JCoP Help Construction Companies Keep Their Water Locked Away?

UK Construction Blog

Dan Simmons, Managing Director and founder, Quensus If insurers were asked to rank what they see as the most costly damages they could incur, you would expect factors like weather, fire and theft to sit high up the table. This system enables automatic water flow monitoring and the ability to shut off the supply.

article thumbnail

How to Choose Trusted Tiny Home Builders in Queensland: Expert Guide 2025

UK Construction Blog

Their expertise covers unique building techniques, system planning, and tiny house requirements. The most trustworthy builders carry proper insurance and provide clear contracts that spell out warranty terms, project timelines, and backup plans. Non-sewered areas require extra certifications for on-site wastewater treatment systems.

article thumbnail

McConnell Dowell completes works on Port Kembla Energy Terminal

Roads Online

Related stories: Works to commence on second stage of Barwon Heads Road upgrade Final designs released for Melton Station, LXRPs Contract awarded for T3 Bankstown Line The result has been the installation of 4.5 To watch and learn more about the project, click here.

article thumbnail

Refine versus shine: Defining and defending design intent with refined concrete

Construction Specifier

Owners and design teams are not protected by todays inadequate and vague polished concrete specifications. Without a quantifiable specification to convey contract requirements, project teams will continue to be handed polished concrete floors that are ripe for change orders and expensive to maintain.