Remove Controls Manufacturing Remove Cost Control Remove HVAC System Installation
article thumbnail

DOE Announces Six Finalists in Home Electrification Prize

The Pro Builder

Energy and power will be monitored and controlled, providing load flexibility, grid resiliency, and home energy insights. are prototyping and demonstrating an HVAC-integrated façade panel system installed onto the building exterior for non-invasive building electrification of multifamily housing. Milwaukie, Ore.)

article thumbnail

New Heating Units Offer Cost-Effective Comfort in Boston Apts

CCR Magazine

QMark® MUH-Pro+ and CU900 electric heaters with SmartSeries® Plus (SSP) digital BACnet thermostats from Goodyear HVAC Sales proved to be the ideal solution. Since opening in 2006, the building needed to address issues with its HVAC systems and controls, which were leading to high monthly electric bills. The culprit?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Armstrong Unveils New Tango Pump

CCR Magazine

Design Envelope Tango is a compact solution that reduces installation costs. Because the two rotating devices share a single casing, installation requires less piping. In addition, the Vertical In-Line orientation means the pump is installed in the piping and does not require an inertia base.

article thumbnail

Choosing the right temporary heating solution for your site

Roads Online

Image/Coates From maintaining thermal comfort and personal safety, to enabling manufacturing, building and industrial processes, many businesses rely on temperature-controlled environments. This is where heating systems can be used as a safety line to meet production deadlines.”

article thumbnail

HVAC Maintenance: Best Practices for Commercial Building Renovations

CCR Magazine

But among all the exciting changes, remember to give your heating and cooling system some love too. Because a well-maintained HVAC system means comfy temperatures for everyone, lower energy bills, and fewer repair headaches down the line. Start by taking stock of your current system. Is it old and tired?

article thumbnail

Ware Malcomb Announces Construction is Complete on Award Winning Precision Labs at Century Boulevard Conversion in Germantown, MD

Civil + Structural Engineer

property has been reimagined to accommodate a full building headquarters featuring 20-foot clear heights, 30 by 40 column spacing, five loading docks, optimal utility services and floor load capacity and the infrastructure necessary for most laboratory, R&D and cGMP manufacturing uses. The single-story 20430 Century Blvd.

article thumbnail

Johnson Controls Updates Industry-Leading Building Automation System

CCR Magazine

Johnson Controls , the global leader for smart, healthy and sustainable buildings, today launched a highly anticipated update to the company’s industry-leading Building Automation System (BAS), Metasys, which serves the needs of commercial, industrial and institutional buildings, regardless of industry. Metasys 14.0