Remove Controls Manufacturing Remove Fire Protection Systems Remove Plumbing Systems
article thumbnail

World’s 1st 100% Digitally-Enabled Facility

CCR Magazine

“Created as a model of post-2030 smart and sustainable construction, this 100% digitally-enabled facility integrates a diverse range of building systems technology (HVAC, lighting, building envelope, security, IT, and communications)”, said Paul Scarafile, Commercial Director, Canada, Armstrong Fluid Technology. “As

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

Key Takeaways Construction defects commonly stem from design deficiencies, poor workmanship, substandard materials and inadequate quality control, potentially reducing property values by up to 25%. Examples include improperly installed plumbing, electrical wiring errors, and poor finishes.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Armstrong’s Fire Manager Boosts Intelligent Pumps

CCR Magazine

Armstrong Fluid Technology has announced the launch of Fire Manager, a cloud-based service that enables Active Performance Management in its industry-leading Design Envelope Fire Pumps. In the shift toward digitalization and integration of fluid-flow systems, Armstrong leads the industry.

article thumbnail

Armstrong Aids Expansion of Deep Lake Water Cooling System

CCR Magazine

Armstrong Fluid Technology recently participated in the expansion of the Enwave Energy Corporation Deep Lake Water Cooling (DLWC) system that provides clean energy services to buildings in downtown Toronto via an innovative district cooling network. Armstrong supplied six 600hp Design Envelope pumps to the project,” Scarafile added.

article thumbnail

Armstrong Unveils New Tango Pump

CCR Magazine

Design Envelope technology includes patented Parallel Sensorless operation, increases flow turn-down and provides built-in flow metering for superior flow control. All Armstrong 360 Service and Support programs optimize the lifetime performance of HVAC systems.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 1 – Instruction to Bidders 7 – Geotech — Ft.