Remove Controls Manufacturing Remove HVAC System Installation Remove Millwork
article thumbnail

‘Invisible’ Heater Design Elevates Comfort and Aesthetics at Manhattan Residential Skyscraper

CCR Magazine

Custom convection style heaters, mounted in the building’s millwork by Faber Industrial Technologies, proved to be the game-changing resolution. Due to mechanical constraints exacerbated by the building’s slim design, hot water was not available in most of the upper residences, rendering hydronic heating systems impractical.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 19 Infection Control Form. 01 21 23 Installation Allowances. 01 33 29.05

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 19 Infection Control Form. 01 21 23 Installation Allowances. 01 33 29.05

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CJ: Control Joint. CONT: Continuous, Continue, Control. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FACP: Fire Alarm Control Panel. HVAC: Heating, Ventilating & Air Conditioning. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CK: Caulking.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CJ: Control Joint. CONT: Continuous, Continue, Control. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FACP: Fire Alarm Control Panel. HVAC: Heating, Ventilating & Air Conditioning. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CK: Caulking.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CJ: Control Joint. CONT: Continuous, Continue, Control. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FACP: Fire Alarm Control Panel. HVAC: Heating, Ventilating & Air Conditioning. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CK: Caulking.