Remove Cost Control Remove Integrated Project Delivery (IPD) Remove Quality Control
article thumbnail

Episode 4: Quality Compromises — Ensuring Quality in Construction

iField Smart

Speaking of construction, quality is perhaps the most vital word associated with any successful construction project. If quality is low, it brings many issues such as delays, safety concerns and conflicting views amongst stakeholders. Quality management does not only involve doing the bare minimum in order to stay compliant.

article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Controlling construction costs is not rocket science, nor does it involve time travel. Any real property owner can control construction costs for facilities repair, renovation, maintenance, and new build projects. Controlling Construction Costs is not rocket science 1.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Turnkey JOC Program

Job Order Contracting

The 4BT-PEP is a turnkey JOC Program that delivers the highest performance at the lowest possible administrative cost. 4BT exclusively provides all of the following, without the need to pay a percentage of construction volume, which results in excessive cost and failure to meet public sector fiscal responsibilities.

article thumbnail

2021 Facilities Repair Renovation and New Construction Cost Management

Job Order Contracting

Introduction – 2021 Facilities Repair Renovation and New Construction Cost Management spans multiple principles, practices, domains, and more. All of the above are available within integrated project delivery (IPD) and LEAN job order contracting (LEAN JOC) frameworks and enabling solution sets.

article thumbnail

A vision for success: Key trends reshaping construction in 2024

Civil + Structural Engineer

By Jake Macholtz, CEO, InEight Against a backdrop of high inflation, the cost-of-living crisis, and ongoing labor and skills shortages, the construction industry has remained buoyant. As we enter 2024, organizations will need to balance delivering on the substantial backlog of projects, while progressing toward full digital transformation.

article thumbnail

Master Builder Concept, LEAN, and Job Order Contracting

Job Order Contracting

Lean construction aims to embody the benefits of the Master Builder concept, as does Advanced Job Order Contracting, Integrated Project Delivery, and Alliance Partnering. This role encompasses all aspects of planning, architecture, engineering, and building, integrating both creative and technical responsibilities.

article thumbnail

Planning Major and Minor Facilities / Asset Repair, Refurbishment, Maintenance, Renovation, and Construction

Job Order Contracting

How real property owners and facilities management professionals traditionally plan, procure, and deliver projects is the most significant barrier to improving capital reinvestment performance outcomes. In fact, less than 20% of all projects are delivered on-time and on-budget, or per stakeholder requirements.