Barhale appointed to East London sewer upgrade
Civil + Structural Engineer
JANUARY 25, 2024
Two sections of the twin mains will be rehabilitated: One section will require Barhale to replace the existing sewer with two lengths of 142m, 800mm diameter HDPE pipe which will be installed through open cut excavation. At the adjacent section, Barhale will repair a 220m length of each main using Cured in Place Pipe (CIPP) relining.
Let's personalize your content