Remove Definition Remove Piping Installation Remove Wall Systems
article thumbnail

Subsea & Topside Corrosion Solutions for a Fluctuating Offshore Market

Civil + Structural Engineer

Unfortunately, infrastructure development takes so long that a good market outlook at the beginning of a greenfield projec t may have completely changed by the time offshore installation is done. On the topside are water injection systems, gas piping systems, and crude oil lines that need protection.

article thumbnail

Industrial Constructors/Managers, Inc. facilitates improvements to aerospace test facility thanks to ‘on the go’ construction and welding

Civil + Structural Engineer

(ICM) , was hired to do in the summer of 2019 for Reaction Engines , a privately-held technology company that’s developing thermal management systems and novel propulsion solutions for the defense and commercial high-speed flight sector, as well as for aviation, automotive, and energy sectors in the US and UK.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

NEW DOCUMENT PROVIDES SEISMIC DESIGN  CRITERIA FOR HDPE PIPE WATER MAINS

Civil + Structural Engineer

Authoritative Study Now Available Heat fusing HDPE pipe sections provides a leak-free joint plus heightened security and protection from seismic events. This critically important document provides the criteria for the proper design of an HDPE water main system,” stated Camille George Rubeiz, P.E.,

article thumbnail

5 Signs Your Hot Water System Needs Professional Attention

UK Construction Blog

The post 5 Signs Your Hot Water System Needs Professional Attention appeared first on UK Construction Blog. Yet, persistent discoloration suggests a failing hot water system in immediate dire need. Frequent flushing helps remove sediment before it damages interior walls or pollutes your water.

article thumbnail

Definition of Design Period | Why Design Period is Provided | Factors Affecting Design Period | Design Period Values

CivilJungle

Definition of Design Period: Design period could be defined as the number of years in the near future in which the supply will surpass the demand. Conduits( Type of Pipes ). Factors Affecting Design Period Type of Pipe. Steel Pipes. Cast Iron Pipes. Concrete Pipes. Distribution system. 25 – 50 Years.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

They’re installed in the walls and slabs such that they are concealed and not visible after the finishing work is done. The pipe and point end left out this later. Waterproofing can also be done to prevent rising dampness from the wall. Later on, the walls are stained or painted. Boundary Wall and Gates.

article thumbnail

Well Point System | Types of Well Point System | Well Point Dewatering | PVC Well Point | Well Point Installation | Well Point for Shallow Well

CivilJungle

Parts consisting in a Well Point are a shallow shaft, a dewatering pump to draw water, a riser pipe that connects the Well Point to the surface , and a small well that fills up. The diameter of a riser pipe is around 38 to 50 mm. The riser pipe of a Well Point is often connected through a flexbow to a common header main pipe.