Remove Electrical Systems Remove Electrical Wiring Installation Remove Heavy Lifting Transportation
article thumbnail

Land Moving Equipment

CivilJungle

While transporting heavy or bulky materials, conveyors are useful. The main components of the brain are chains, sheaves, wire ropes etc and with the help of them, a crane can lift the materials and also can lower them. Heavy materials are lifted and transported to other places with the help of the cranes.

article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Have everything under control with a flexible hierarchical folder system that can be accessed from any device. From flat roofs to sloped roofs, there are various types to consider.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

All About of Construction Equipment | Types of Construction Equipment | Machines Used in Construction | Heavy-Duty Equipment

CivilJungle

Excavators help in a lot of work such as digging trenches, breaking holes to lifting away waste etc. They help in the transfer of material from stockpiles on the ground to trucks and transport them around the construction site. Trencher used to dig trenches, especially for laying pipes or electrical cables, for installing drainage.

article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

OSHA requires that holes in walking surfaces and skylight areas six feet or higher above a lower level must be protected by covers, guardrails, or fall arrest systems. Guardrail installation also applies to stairs, runways, and ramps situated six feet above a lower level. Electrocution. Manual material handling.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

Utilized during a flat plate system, it’s impossible to possess a sizeable span. It eliminates the need to drill in slabs for an electrical and plumbing unit. It eliminates the necessity to drill in slabs for electrical and plumbing units. It surges the shear strength of the slab. Higher slab bulkiness.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. 01 21 23 Installation Allowances.