Remove Electrical Systems Remove Heavy Lifting Transportation Remove Material Storage Remove Renewable Energy Systems
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Review the Standard Operating Procedure for “Controlling Hazardous Energy Sources”. De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. Recommended Tools, Materials, and Equipment: 1. Tool Group A.

article thumbnail

$7.5B Digital Infrastructure City To Be Built In Las Vegas

Business Facilities

The net-zero buildings within their own insular mini-city will feature automated multi-functional designs, renewable energies from solar/wind/water/kinetic, autonomous vehicles, artificial intelligence (AI), augmented reality, Internet of Things (IoT), robotics, supertrees, and self-healing concrete structures. CTIO, Bertrand Dano.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

We also configured our Renewable Energy Leaders category to rank the metros that are using the most renewable energy, with some surprising results (hint: the top-ranked metro is the home of the oil bidness). (To million toward economic growth projects (including a new streetcar system). billion), Oakland ($22.0

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 31 25 Existing Material Information. Material Testing Information.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 31 25 Existing Material Information. Material Testing Information.