Remove Electrical Wiring Installation Remove Fire Protection Systems Remove Heavy Equipment Manufacturing
article thumbnail

Electrocutions: A Very Scary Reality at Construction Sites

CCR Magazine

OSHA also highlights that electrocutions are the third-highest cause of workers’ deaths after falls and hits from construction materials and equipment. These include: Harsh Weather Situations Weather conditions like heavy rains and thunderstorms can lead to irregular electrical conductivity.

article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Following these codes is a must-do to stay compliant and make sure everyone inside the building is secure and protected. Safety first! Well, it sets the stage for success.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Preventive maintenance services should be performed by a qualified manufacturer’s service representative. Review manufacturer’s instructions. De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions.

article thumbnail

Top Fines & OSHA Regulations

Safety Services Company

They also need to know what protective measures are available to prevent adverse effects from occurring. Suppliers and manufacturers are required to provide SDS to their customer’s along with the chemicals. #9: 7: HEAD PROTECTION. There is a possibility of accidental head contact with electrical hazards. 9: TRAINING.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

AIEE: American Institute of Electrical Engineers. AWG: American Wire Gauge. CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. ELEC: Electrical. ELECT: Electrical. EP: Electrical Panelboard, Explosion Proof.