Remove Electrical Wiring Installation Remove Fire Protection Systems Remove HVAC System Installation Remove Piping Installation
article thumbnail

9 Home Renovation Projects You Shouldn’t DIY

CCR Magazine

The roof protects your home from the elements, ensuring that you and your family remain safe. HVAC Systems HVAC systems , which stand for Heating, Ventilation, and Air Conditioning, are integral to maintaining a comfortable environment in homes and buildings.

article thumbnail

Prepare for Home Renovation with These Insightful Tips

West Shore Construction

If you want to get the most out of your renovation, USA Today suggests considering the following improvements : Replace the tub Install natural stone kitchen countertops Replace siding and garage doors You Need a Place to Store Your Stuff Before contractors can start demolition, you need to clear out the room.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Creating A Mobile Office: How To Use Shipping Containers

UK Construction Blog

Remember to factor in windows for natural light and proper ventilation systems for fresh air. You’ll also want to plan for electrical installations and internet connectivity. Also, think about installing a heating, ventilation, and air conditioning (HVAC) system to manage temperature fluctuations effectively.

article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Following these codes is a must-do to stay compliant and make sure everyone inside the building is secure and protected. Safety first!

article thumbnail

How to plan your warehouse layout

The Korte Company

They protect inventory and, when built right, improve on the efficiency with which that inventory is received, sorted, retrieved and shipped. Racking systems play an outsized role when owners plan warehouse layout. If the type and amount of goods your facility stores or distributes varies, a stand-alone system might be best.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. Review manufacturer’s instructions. Clean motor and assembly.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 01 51 13 Temporary Electricity.