Remove Electrical Wiring Installation Remove Heavy Lifting Transportation Remove Insurance Management
article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

Guardrail installation also applies to stairs, runways, and ramps situated six feet above a lower level. Getting caught in a piece of machinery or caught between a piece of heavy equipment and the ground or a wall could result in the loss of life or limb. Heavy loads should be transported by carts, dollies, and lifting tables.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 42 23 Proposal Form – Construction Management (Single-Prime Contract). 00 62 16 Certificate of Insurance Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 42 23 Proposal Form – Construction Management (Single-Prime Contract). 00 62 16 Certificate of Insurance Form.