Remove Electrical Wiring Installation Remove Heavy Lifting Transportation Remove Ramps
article thumbnail

All About of Construction Equipment | Types of Construction Equipment | Machines Used in Construction | Heavy-Duty Equipment

CivilJungle

Excavators help in a lot of work such as digging trenches, breaking holes to lifting away waste etc. They help in the transfer of material from stockpiles on the ground to trucks and transport them around the construction site. Trencher used to dig trenches, especially for laying pipes or electrical cables, for installing drainage.

article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

Guardrail installation also applies to stairs, runways, and ramps situated six feet above a lower level. Getting caught in a piece of machinery or caught between a piece of heavy equipment and the ground or a wall could result in the loss of life or limb. Heavy loads should be transported by carts, dollies, and lifting tables.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 01 21 23 Installation Allowances. Prohibited Content Installer Certification. 01 43 23 Installer Qualifications. 01 51 13 Temporary Electricity. 01 53 23 Temporary Ramps. 01 73 19 Installation. 01 76 00 Protecting Installed Construction.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 01 21 23 Installation Allowances. Prohibited Content Installer Certification. 01 43 23 Installer Qualifications. 01 51 13 Temporary Electricity. 01 53 23 Temporary Ramps. 01 73 19 Installation. 01 76 00 Protecting Installed Construction.