Remove Electrical Wiring Installation Remove Heavy Lifting Transportation Remove Site Planning
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Architectural Plans and Blueprints Turning to the cool stuff architects and engineers create to bring buildings to life: architectural plans and blueprints. Safety first!

article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

Guardrail installation also applies to stairs, runways, and ramps situated six feet above a lower level. Getting caught in a piece of machinery or caught between a piece of heavy equipment and the ground or a wall could result in the loss of life or limb. Heavy loads should be transported by carts, dollies, and lifting tables.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

It eliminates the need to drill in slabs for an electrical and plumbing unit. It eliminates the necessity to drill in slabs for electrical and plumbing units. The hollow core ribbed slab modules are also impaired during transport. The hollow core ribbed brick units are also impaired during transport.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. Site Survey Information. Electrical Resistivity Investigations Information. 00 43 86 Proposed Work Plan Schedule Form. Site Survey Information. Electrical Resistivity Investigations Information. 00 43 86 Proposed Work Plan Schedule Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. Site Survey Information. Electrical Resistivity Investigations Information. 00 43 86 Proposed Work Plan Schedule Form. Site Survey Information. Electrical Resistivity Investigations Information. 00 43 86 Proposed Work Plan Schedule Form.