Remove Electrical Wiring Installation Remove HVAC System Installation Remove Insurance Management
article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Examples include improperly installed plumbing, electrical wiring errors, and poor finishes.

article thumbnail

Why I Chose a Tiny Container Home Over a Tiny House (Real Costs Revealed)

UK Construction Blog

These include energy-saving windows and systems to save water. Modern container homes’ Heat Recovery Ventilation System keeps 85% of thermal energy. Of course, each option brings its own challenges with insurance and financing. These containers come pre-built, which cuts down on labour costs and wastes less material.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

5 Genius Building Techniques to Reduce Home Maintenance Costs for Life

UK Construction Blog

Fact: According to the National Pest Management Association, termites cause over $5 billion in property damage annually in the United States alone. High-Efficiency HVAC Systems Invest in a high-efficiency heating, ventilation, and air conditioning (HVAC) system.

article thumbnail

Commercial Construction Strategies: Flagship Stores to Footprint Expansion

Commercial Construction Blog

More often than not, a prototype feature entails materials the client hasn’t used before, so it is the contractor’s job to figure out sourcing, lead time, and any questions regarding installation. Special attention was needed for the new HVAC systems throughout the building. Working with equipment suppliers ahead of time is key.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. Requirements. 00 01 07 Seals Page.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. Requirements. 00 01 07 Seals Page.