Major Museum Renovation Combines Dramatic Design with Much-needed Infrastructure Improvements
Civil + Structural Engineer
MARCH 25, 2024
Three are being installed at the main entrance (West elevation) and one on the South elevation at an entrance primarily used by employees. The partial model was installed, glazed, and sealed on a mocked up concrete pad. The electrical conduit runs through the frames and the team had to coordinate wiring issues.
Let's personalize your content