Remove Environmental Impact Assessment Remove Heavy Lifting Transportation Remove Ramps Remove Renewable Energy Systems
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Review the Standard Operating Procedure for “Controlling Hazardous Energy Sources”. This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements. Review manufacturer’s instructions. Check Points: 1.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 31 24 Environmental Assessment Information. 01 53 23 Temporary Ramps.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 31 24 Environmental Assessment Information. 01 53 23 Temporary Ramps.