article thumbnail

Using DAS to Solve Capacity and Connectivity Challenges

Civil + Structural Engineer

The solution Mr. Tardy referenced is a Distributed Antenna System, or DAS. FPA provided telecommunications engineering and design services for the installation and design of a DAS consisting of 47 antennas within the stadium. These are issues that we have encountered, solved, and currently have solutions to address.”

article thumbnail

Exterior cavity fireblocking: Exceeding fire performance

Construction Specifier

These applications range from fireproofing of structural steel, through-penetration firestopping of mechanical and electrical service, perimeter edge sealing of fire doors, to joint and gap sealing to limit fire spread. Intumescent materials, which expand when heated, provide a critical barrier against heat and flame during fire events.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Queens Chamber of Commerce Honors Nichiren Shoshu Temple Upgrade

CCR Magazine

The 40-year-old structure needed to be expanded and modernized ahead of the 800th anniversary of Nichiren Shoshu, the largest sect of this Buddhist faith, scheduled to take place throughout 2022. New HVAC, electrical systems and structural steel framing were installed.

article thumbnail

Tampa Convention Center undergoes largest reno in history

Construction Specifier

Alterations include a 2,183-m 2 (23,500-sf) expansion to the facility and the addition of 1,672 m 2 (18,000 sf) of new waterfront rooms that will provide flexible meeting and event spaces.

article thumbnail

Prepare for Home Renovation with These Insightful Tips

West Shore Construction

If you want to get the most out of your renovation, USA Today suggests considering the following improvements : Replace the tub Install natural stone kitchen countertops Replace siding and garage doors You Need a Place to Store Your Stuff Before contractors can start demolition, you need to clear out the room.

article thumbnail

Phases of Commercial Real Estate Development

Construction Marketing

Engineers will also work on the design to ensure that the building is structurally sound and that all systems, such as electrical and plumbing, are correctly designed. This includes site preparation, excavation, foundation work, framing, and installation of electrical, plumbing, and HVAC systems.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.