Remove Fire Protection System Installation Remove Heavy Equipment Manufacturing Remove Lifts
article thumbnail

Promat SYSTEMGLAS® F1 meets glazing vision inside airline’s pioneering new operations centre

Specification Product Update

Two large internal glass screens which balance aesthetics with assured fire protection have been created using Promat SYSTEMGLAS ® F1 within a new multi-million pound facility to support the day-to-day operations of a major UK airline. The twin 6m wide by 2m high glass screens feature inside the purpose-built 150,000 sq.

article thumbnail

Promat SYSTEMGLAS® F1 meets glazing vision inside airline’s pioneering new operations centre

Specification Product Update

Two large internal glass screens which balance aesthetics with assured fire protection have been created using Promat SYSTEMGLAS ® F1 within a new multi-million pound facility to support the day-to-day operations of a major UK airline. The twin 6m wide by 2m high glass screens feature inside the purpose-built 150,000 sq.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Safe From the Start

Autodesk Construction Cloud

And rather than regularly regrading temporary roadways, ring roads are a way to accommodate heavy traffic from the start and make the delivery and handling of materials work smoothly on a consistent and ongoing basis. Assembly of these systems at waist-level, then raising it to be tacked in, increases safety, quality, and production.

article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Following these codes is a must-do to stay compliant and make sure everyone inside the building is secure and protected. Safety first! Well, it sets the stage for success.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid level and pressures/ change fluid per manufactures recommendations. Recommended Tools, Materials, and Equipment: 1. This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.