Remove Fire Protection System Installation Remove Inspection Remove Masonry
article thumbnail

Barrier breakthroughs: Achieving airtightness in modern construction

Construction Specifier

When designed and installed correctly, air barriers contribute to the long-term durability of a building. Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical.

article thumbnail

Brick Cladding Options for External Walls

UK Construction Blog

This guide covers top brick cladding options, including types, benefits, and installation tips for external walls. Key Takeaways Brick cladding systems provide a durable and efficient solution for enhancing building aesthetics while offering various types, including brick slips, handmade tiles, and modern brick effect panels.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

Generally, a roof is replaced after thirty years; in the real world, there are so many things that can damage your roof and repair , or inspection work is needed. We need to hire a roofing contractor for inspection purposes or use a binocular. We need to hire a roofing contractor for inspection purposes or use a binocular.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.

article thumbnail

What Is Falsework | Types of Falsework |Causes of Falsework Failures

CivilJungle

Falsework may be required to support steel and timber frameworks and masonry arches as well as in situ and precast concrete construction. • Shorbrace System. Cup-Lock Supporting System. Shorbrace System. The shorbrace support system is used widely to support the bridge deck. This system possesses many merits.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use. Tool Group A.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Masonry Information. Existing Thermal and Moisture Protection Information.