Remove Fire Protection System Installation Remove Masonry Remove Waterproofing Systems
article thumbnail

Barrier breakthroughs: Achieving airtightness in modern construction

Construction Specifier

When designed and installed correctly, air barriers contribute to the long-term durability of a building. Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Masonry Information. Existing Thermal and Moisture Protection Information.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Masonry Information. Existing Thermal and Moisture Protection Information.

article thumbnail

What Is Skirting | Types of Skirting | Skirting Replacement Cost | Purpose of Skirting Boards | What is Skirtig Roof | Skirting on Batheroom

CivilJungle

Types of Roof Tiles | Tile Roof Replacement | Tile Installation Cost | Roofing Tile Price | Ceramic Tile Price Per Square Foot | Tile Installation Factors. Movable skirting is generally installed under the cabinet which has a internal lock inside the skirting. Classification of Stone Work | What Is Stone Masonry.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use. Consult the Material Safety Data Sheets (MSDS) for hazardous ingredients and proper personal protective equipment (PPE). Special Instructions: 1. Lubricants.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CMU: Concrete Masonry Unit. CMUP: Concrete Masonry Unit Painted. CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FAG: Fire Alarm Gong.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CMU: Concrete Masonry Unit. CMUP: Concrete Masonry Unit Painted. CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FAG: Fire Alarm Gong.