Remove Fire Protection System Installation Remove Piping Installation Remove Plumbing Systems
article thumbnail

APPLYING SPRAY FOAM INSULATION ON AND AROUND PLASTIC PIPES

Civil + Structural Engineer

New Technical Document Details Proper Steps for Use IRVING, Texas – A new technical document that addresses techniques for the safe and proper use of spray polyurethane foam insulation on and around plastic pressure pipe materials has been published by the Plastics Pipe Institute, Inc. layer) thickness installed.

article thumbnail

Plumbing Challenges in High-Rise Construction: A Plumber’s View

CCR Magazine

However, behind the scenes, theres a network of intricate plumbing systems that keep everything running smoothly. Plumbing in high-rise construction is far more complicated than in single-story homes or low-rise buildings. Plumbers often address this issue by installing booster pumps and pressure-regulating valves.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Examples include improperly installed plumbing, electrical wiring errors, and poor finishes.

article thumbnail

High-Rise Maintenance: Innovative Solutions for Building Care

CCR Magazine

From drones that inspect hard-to-reach places to smart systems that predict equipment failure, the options available today are both fascinating and practical. Electrical and Plumbing Systems Review Maintaining a high-rise’s internal systems is essential. With mobile access, information is always at your fingertips.

article thumbnail

IFS renovates two historic buildings into mixed-use lofts

CCR Magazine

IFS provided design/build HVAC, fire protection and plumbing services as part of the $9.6 Image Courtesy of Advantes Group IFS also provided design/build HVAC, fire protection and plumbing services as part of the $14 million Greeley Lofts renovation. Located in the 600 block of N.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

article thumbnail

Armstrong Unveils New Tango Pump

CCR Magazine

Design Envelope Tango is a compact solution that reduces installation costs. Because the two rotating devices share a single casing, installation requires less piping. In addition, the Vertical In-Line orientation means the pump is installed in the piping and does not require an inertia base.