IFS renovates two historic buildings into mixed-use lofts
CCR Magazine
JANUARY 30, 2024
Integrated Facility Services (IFS) has completed complex mechanical contracting projects to convert two historic buildings in downtown St. IFS provided design/build HVAC, fire protection and plumbing services as part of the $9.6 Louis into mixed-use lofts and commercial space. Located in the 600 block of N.
Let's personalize your content