Remove Fire Protection System Installation Remove Plumbing Systems Remove Wall Systems
article thumbnail

APPLYING SPRAY FOAM INSULATION ON AND AROUND PLASTIC PIPES

Civil + Structural Engineer

PPI and SPFA recommend that when there are plastic pipes and fittings in a wall, ceiling, or floor cavity, the SPF installer should apply one layer of foam until it touches the pipe but does not encase the pipe. layer) thickness installed. executive director of SPFA, “which means that heat is generated during the foam reaction.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Examples include improperly installed plumbing, electrical wiring errors, and poor finishes.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Plumbing Challenges in High-Rise Construction: A Plumber’s View

CCR Magazine

However, behind the scenes, theres a network of intricate plumbing systems that keep everything running smoothly. Plumbing in high-rise construction is far more complicated than in single-story homes or low-rise buildings. Plumbers often address this issue by installing booster pumps and pressure-regulating valves.

article thumbnail

Oregon architect’s HQ: Northwest’s first ‘all-wood’ mass timber project

Construction Specifier

The building represents a structure made almost entirely of wood with all-electric, refrigerant-free, hydronic heating, and cooling systems. The building also incorporates all-electric, refrigerant-free, hydronic heating and cooling systems. The interior of the building shows the exposed wood walls. Photos courtesy Lara Swimmer.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

article thumbnail

IFS renovates two historic buildings into mixed-use lofts

CCR Magazine

IFS provided design/build HVAC, fire protection and plumbing services as part of the $9.6 Image Courtesy of Advantes Group IFS also provided design/build HVAC, fire protection and plumbing services as part of the $14 million Greeley Lofts renovation. Located in the 600 block of N.

article thumbnail

Alexandria City HS Redevelopment Features Rockfon Ceilings

CCR Magazine

The architectural team specified Rockfon acoustic stone wool ceiling systems to support the new high schools multiple performance requirements and to create a modern appearance aligned with 21st century educational facilities. The Minnie Howard Campus high school offers enhanced daylight, thermal comfort, acoustics and indoor air quality.