Remove Fire Protection System Installation Remove Prefabrication Remove Waterproofing Systems
article thumbnail

Barrier breakthroughs: Achieving airtightness in modern construction

Construction Specifier

When designed and installed correctly, air barriers contribute to the long-term durability of a building. Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 01 73 19 Installation.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 01 73 19 Installation.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

Utilized during a flat plate system, it’s impossible to possess a sizeable span. Excellent fire resistance and sound insulation are the other attributes of a hollow core slab due to its thickness. Protection against enviromental hazards. It surges the shear strength of the slab. Disadvantages of Flat Slab .

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FAG: Fire Alarm Gong. FBRK: Fire Brick. FDC: Fire Department Connection. FHY: Fire Hydrant.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FAG: Fire Alarm Gong. FBRK: Fire Brick. FDC: Fire Department Connection. FHY: Fire Hydrant.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FAG: Fire Alarm Gong. FBRK: Fire Brick. FDC: Fire Department Connection. FHY: Fire Hydrant.