Remove Fire Protection System Installation Remove Project Management Remove Structural Systems
article thumbnail

Rhino Doors nears completion on London Underground’s Bank Station project

Civil + Structural Engineer

The project, which involved designing, manufacturing and installing 20 self-closing fire doors in the cross passages at Bank Station, presented a number of logistical challenges. “As We have had to be responsive to the demands of this installation – it has been very much a bespoke solution,” said Dr Norris.

article thumbnail

THINKING OUTSIDE THE STEEL BOX: How the Tent Industry Is Currently Solving 

Civil + Structural Engineer

P.Eng, Tamarack Grove Engineering Cody Jones , Bledsoe Tents The modern-day engineered fabric structure, known more universally as a tent, has applications far beyond weddings, social events, and as temporary expansion space. Sielaff , P.E.,

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Barrier breakthroughs: Achieving airtightness in modern construction

Construction Specifier

When designed and installed correctly, air barriers contribute to the long-term durability of a building. Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical.

article thumbnail

Transform Your Garage: Essential Upgrades for DIY Vehicle Maintenance

UK Construction Blog

Installing bright LED lights (3000-5000 lumens) eliminates shadows under vehicles and in engine compartments. An upgraded electrical system supports your maintenance activities effectively. An upgraded electrical system supports your maintenance activities effectively.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. These defects range from minor aesthetic issues like cracked tiles to serious structural problems that compromise safety.

article thumbnail

Plumbing Challenges in High-Rise Construction: A Plumber’s View

CCR Magazine

However, behind the scenes, theres a network of intricate plumbing systems that keep everything running smoothly. Water Pressure Management: A Tall Order One of the biggest challenges plumbers face in high-rise construction is managing water pressure. However, balancing water pressure without overcompensating can be tricky.

article thumbnail

Design Advantage for Division 7 – Thermal and Moisture Protection

GCP Applied Technologies

Design Advantage for Division 7 – Thermal and Moisture Protection. As building technologies evolve into more complex systems and assemblies, don't feel like you have to specify alone. GCP’s Design Advantage collaborates with the project team to specify the appropriate products and systems for any construction project.