Remove Fire Protection Systems Remove Flooring Systems Remove Stonework
article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

“I knew the view from the back of the lot would be great but also a little off-center to the right,” Coletti says, “so I put the kitchen in the left back corner of the floor plan to capture the best view.” The rest of the 7,800-square-foot, single-level floor plan flowed fairly easily from there, he says.

article thumbnail

Protecting lives and our most important heritage

Specification Product Update

Advances in fire resistant glazing have enabled modern performance expectations to be applied to architecturally sensitive and listed buildings as a variety of Promat SYSTEMGLAS® projects demonstrate. It was used to meet demanding passive fire protection objectives as part of a major project to upgrade the historic Victorian Market hall.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.