article thumbnail

ACS launches “game changing” Intex range

Construction Enquirer

Structural building components specialist ACS Stainless Steel Fixings (ACS) has launched Intex Fire Protect. It is the first masonry support system combining four critical components in one easy-to-fit design – meaning it is over 40% faster to install.

article thumbnail

KEIM – the eco friendly masonry paint which meets the highest fire resistant classification.

Specification Product Update

Let’s share the great news KEIM silicate paints are fire resistant to the highest Euronorm classification (EN13501-1), ideal for specifiers, contractors, housing associations and councils involved with decoration and refurbishment of high rise buildings in the UK, to ensure compliance with current fire regulations.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TCF Industrial Building #1

The MCP Group

Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KHRC Office Remodel

The MCP Group

Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. 2021 Addenda None at this time.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Location Manhattan, Kansas Plans KSU Agronomy Research & Innovation Center Combined Plans Specifications KSU Agronomy Research & Innovation Center Combined Specifications General Information Bid Invitation KSU Agronomy Research & Innovation Center MCP Supplemental Conditions.2021

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

article thumbnail

AIM’S CAVITY BARRIERS SELECTED FOR ‘PATH-BREAKING’ UNIVERSITY ACCOMMODATION

Specification Product Update

AIM worked with Maple Sunscreening on the rainscreen façade system assembly from the ground floor upwards, which is mainly cassette panels with AIM’s OSCBs incorporated horizontally and AIM’s wall cavity barriers installed vertically. AIM won the business after supplying barrier samples for BS 8414 mock up fire testing, which was successful.