article thumbnail

ACS launches “game changing” Intex range

Construction Enquirer

Structural building components specialist ACS Stainless Steel Fixings (ACS) has launched Intex Fire Protect. It is the first masonry support system combining four critical components in one easy-to-fit design – meaning it is over 40% faster to install.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Location Manhattan, Kansas Plans KSU Agronomy Research & Innovation Center Combined Plans Specifications KSU Agronomy Research & Innovation Center Combined Specifications General Information Bid Invitation KSU Agronomy Research & Innovation Center MCP Supplemental Conditions.2021

article thumbnail

AIM’S CAVITY BARRIERS SELECTED FOR ‘PATH-BREAKING’ UNIVERSITY ACCOMMODATION

Specification Product Update

AIM Acoustic & Insulation Manufacturing has supplied wall cavity barriers and open state cavity barriers (OSCBs), along with technical support, for a ‘path-breaking’, 900-room student accommodation development at the University of West England Bristol’s Frenchay Campus. AIM’s products were supplied through SIG Manchester.

article thumbnail

FHSU Forsyth Library Renovation

The MCP Group

Location Hays, Kansas Plans FHSU Forsyth Library Renovation Combined Plans Specifications FHSU Forsyth Library Renovation Combined Specifications General Information Bid Invitation FHSU Forsyth Library Renovation MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post FHSU Forsyth Library Renovation appeared first on MCP GROUP.

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

Bid Due Date | January 18, 2024 2:00 PM Project Description The project consists of 3 new pre-engineered metal buildings totaling 20,800 sf and associated site work. 2021 Addenda ADD 1 The post KDOT Gardner Subarea Complex appeared first on MCP GROUP.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)