Remove Fire Protection Systems Remove Plumbing Systems Remove Wall Systems
article thumbnail

APPLYING SPRAY FOAM INSULATION ON AND AROUND PLASTIC PIPES

Civil + Structural Engineer

PPI and SPFA recommend that when there are plastic pipes and fittings in a wall, ceiling, or floor cavity, the SPF installer should apply one layer of foam until it touches the pipe but does not encase the pipe. In certain instances, pipes and fittings are installed inside areas that must be insulated, such as within a ceiling or wall cavity.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Oregon architect’s HQ: Northwest’s first ‘all-wood’ mass timber project

Construction Specifier

The building represents a structure made almost entirely of wood with all-electric, refrigerant-free, hydronic heating, and cooling systems. The building also incorporates all-electric, refrigerant-free, hydronic heating and cooling systems. The interior of the building shows the exposed wood walls. Photos courtesy Lara Swimmer.

article thumbnail

Continuous insulation performance

Construction Specifier

The goals of building fire safety and energy efficiency are compatible when industry stakeholders work together to make sure proper assemblies are designed, the correct materials are specified, and installers have the experience to combine the building design and materials properly in the field. Photo © BigStockPhoto.com.

article thumbnail

IFS renovates two historic buildings into mixed-use lofts

CCR Magazine

IFS provided design/build HVAC, fire protection and plumbing services as part of the $9.6 Image Courtesy of Advantes Group IFS also provided design/build HVAC, fire protection and plumbing services as part of the $14 million Greeley Lofts renovation. Located in the 600 block of N.

article thumbnail

The three Ps of prefabricated EIFS: Preparation, production, placement

Construction Specifier

Babaian Photos and illustrations courtesy Simpson Gumpertz & Heger (SGH) In its most general form, exterior insulation and finish systems (EIFS) consist of expanded polystyrene (EPS) insulation board coated with a reinforced polymer-modified cementitious base coat and a polymer-based finish coat. By Alex Ardelean, Elizabeth V.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021