Remove Fire Protection Systems Remove Roofing Systems Remove Steel Fabrication Remove Wall Systems
article thumbnail

Playing with Fabric

Civil + Structural Engineer

By Shannon Humbert, Legacy Building Solutions Rigid-frame fabric buildings offer a permanent solution for athletic facilities. For many entities, both public and private, the need for an athletics and recreation facility comes down to two options: A permanent brick and mortar building, or a lower-cost fabric bubble.

article thumbnail

FHSU Forsyth Library Renovation

The MCP Group

The work includes site demolition, selective demolition, earthwork, erosion control, site concrete, brick pavers, decorative fences, landscaping & irrigation, site utilities, cast-in-place concrete, masonry, stone, stone cleaning, cast stone, structural steel, decorative stairs & railings, architectural woodwork, air barriers, EPDM roofing, (..)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Renovation Trends in Material Selection for Sustainable Homes

Construction Daily News

Durable Roofing The roof is the home’s first line of defense against the elements. Traditional roofing projects use basic asphalt shingles or choose between wood shingles vs wood shakes. However, these products will not offer the most long-lasting protection. It is completely fire and pest resistant.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)