Remove Fire Protection Systems Remove Stonework Remove Wall Systems
article thumbnail

Protecting lives and our most important heritage

Specification Product Update

Advances in fire resistant glazing have enabled modern performance expectations to be applied to architecturally sensitive and listed buildings as a variety of Promat SYSTEMGLAS® projects demonstrate. It was used to meet demanding passive fire protection objectives as part of a major project to upgrade the historic Victorian Market hall.

article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

It includes an owner’s bedroom on the opposite end of the rear elevation that fully embraces the valley, and walls of glass at the home’s entry and along the back of the house that showcase a through-view to the lights of Las Vegas and the mountain range beyond. Project specs: The New American Home 2024 Location: Ascaya , Henderson, Nev. “I

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Mortar in Civil Engineering | What Is Mortar | Properties of Mortar | Uses of Mortar | Types of Mortar | Mortar in Construction

CivilJungle

This is utilized to bond stonework or other essential units. To do pointing and plasterwork on uncovered surfaces of stonework. It can be used to fill the gaps among bricks or stones to make walls strong. Mortars included in mold soft layers of bricks and stones in wall construction. Towards pointing the masonry holes.

Masonry 52
article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.