Remove Flooring Systems Remove Heavy Lifting Transportation Remove Piping Installation Remove Plumbing Systems
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. These drawings include all the juicy details, like how the floors are laid out, the building looks from different angles and even the little intricacies of the construction process.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

Slabs are structural elements manufactured from concrete constructed to produce flat surfaces, usually horizontal, in building floors, roofs, bridges. It diminishes floor -to-floor lofts when there’s no requirement for a deep false ceiling& hence building loftiness may be diminished. What Is a Slab?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Is Crane | Different Types of Cranes

CivilJungle

Equipped with a hoist rope, cable ropes and sheaves, it may be used to lift heavy loads or transport them to other places. The cranes are basically for heavy construction work and for all types of lifting tasks. Also, read: Different Types of Plumbing Pipes for Different Use. How does a crane work?

article thumbnail

What Is Sewerage | What Is Storm Drain | Household Drain Systems | House Drainage Parts And Components | Types of Sewer Pipes | Sanitary Pipework |

CivilJungle

A sewerage system, or waste product assortment system, may be a mesh of pipes, pumping stations, and appurtenances that convey waste stuff from its points of origin to a degree of treatment and disposal. The storm sewer is actually a system constructed to transport rain-water and other drainage wastes. Wash Basin.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements. Clean motor and assembly. Clean drive mechanism compartment.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 21 23 Installation Allowances. Prohibited Content Installer Certification.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 21 23 Installation Allowances. Prohibited Content Installer Certification.